AK Awasthi, station in-charge of the Barabanki bus station-cum-workshop, said ₹2.36 crore was transferred to the Uttar Pradesh Power Corporation Limited (UPPCL) on September 17, 2025, for establishing the electricity connection needed for the charging station.