Sirte Oil Company completes drilling of horizontal well C345H in the Ziltan field with production rate of 2,000 barrels per day

Sirte Oil Company reported last Friday (20 February) the successful drilling and completion of the horizontal well C345H in the Ziltan (L4) reservoir with production a rate exceeding 2,000 barrels per day. The company said the well boasts a horizontal cross-section exceeding 1,300 feet and utilizes the latest directional drilling and high-precision reservoir guidance technologies. […] The post Sirte Oil Company completes drilling of horizontal well C345H in the Ziltan field with production rate of 2,000 barrels per day appeared first on LibyaHerald .