Huge 1,400-ton bridge relocated 100m without using a single crane
The new Rauchmühle bridge in Innsbruck, Austria, was built close to its final location to keep disruption to a minimum. Engineers then began lifting the structure more than five metres off the ground using hydraulic presses.