Nigerian Tribune
The Transmission Company of Nigeria, (TCN), had access to Mainstream Energy Solutions Limited, (MESL), operator of the Kainji Hydro Power Plant in Niger State, to commence the Kainji Switchyard Units 1G3 and 1G4 bays construction project at the Kainji Transmission Substation. The post TCN grants mainstream site access for construction of 2X330kV bays at Kainji Substation appeared first on Tribune Online .
Go to News Site