Collector
Giriş Yap
Zojila Marvel: How Engineers Built A 13-KM Tunnel At 11,500 Feet And What It Means For The Army | Collector
Zojila Marvel: How Engineers Built A 13-KM Tunnel At 11,500 Feet And What It Means For The Army

Zojila Marvel: How Engineers Built A 13-KM Tunnel At 11,500 Feet And What It Means For The Army

The project's centrepiece is a 13.153-kilometre single-tube, two-lane tunnel running beneath the Zojila Pass between Baltal in Kashmir and Minamarg on the Ladakh side

Go to News Site