Collector
Pod taxi to cater to 17% of BKC traffic: MMRDA | Collector
Pod taxi to cater to 17% of BKC traffic: MMRDA
Hindustan Times

Pod taxi to cater to 17% of BKC traffic: MMRDA

According to officials from the MMRDA, the pod taxi project will be implemented in two phases – the first phase, spanning 3.36 km, will have 22 stations placed 200 meters apart to ensure maximum accessibility for office-goers; the second phase, spanning around 5.5 km, will have 16 stations

Go to News Site