Collector
Bandra-Versova Sea Link redesign gets green nod; cost rises by 60% | Collector
Bandra-Versova Sea Link redesign gets green nod; cost rises by 60%
Hindustan Times

Bandra-Versova Sea Link redesign gets green nod; cost rises by 60%

The modifications sought include shifting three navigational spans at Juhu, reducing the number of lanes on two connectors to the sea link, and increasing the length of one of the connectors

Go to News Site