Collector
Donkarayi power house to go through second capital overhaul in 13 years | Collector
Donkarayi power house to go through second capital overhaul in 13 years
The Hindu

Donkarayi power house to go through second capital overhaul in 13 years

This unit was commissioned in 1983 and the last time a refit happened was in 2012

Go to News Site