Collector
Metro Phase 2 gains pace with new corridors; Phase 1 ridership crosses 10cr | Collector
Metro Phase 2 gains pace with new corridors; Phase 1 ridership crosses 10cr
Hindustan Times

Metro Phase 2 gains pace with new corridors; Phase 1 ridership crosses 10cr

A major long-distance corridor between Bhakti Shakti and Chakan, spanning 45.29 km with 34 stations and an estimated cost of ₹12,937 crore, is currently in Detailed Project Report (DPR) preparation. The proposed line aims to connect Pimpri-Chinchwad with the Chakan industrial belt.

Go to News Site