Collector
Iran aims to restore majority of refining capability within two months, oil ministry offic | Collector
Iran aims to restore majority of refining capability within two months, oil ministry offic
Al Arabiya English

Iran aims to restore majority of refining capability within two months, oil ministry offic

Iran expects to restore most damaged refining and distribution facilities to 70–80 percent of their pre-attack capacity within one to two months, a senior oil official said, as authorities work to recover from a wave of strikes on energy infrastructure.For all the latest headlines, follow our Google News channel online or via the app.Deputy Minister of Oil Mohammad Sadeq Azimifar told the Student News Network that repair work had begun and that part of the Lavan refinery is expected to resume operations within about 10 days, with other units coming back online gradually.Read more: IRGC says will deal ‘severely’ with military ships transiting Strait of Hormuz

Go to News Site