Collector
Iran aims to restore majority of refining capability within two months, oil ministry official says | Collector
Iran aims to restore majority of refining capability within two months, oil ministry official says
Business Recorder

Iran aims to restore majority of refining capability within two months, oil ministry official says

DUBAI: Iran expects to restore most ​damaged refining and ‌distribution facilities to 70–80% of their pre-attack ​capacity within one ​to two months, a ⁠senior oil official ​said, as authorities ​work to recover from a wave of strikes on ​energy infrastructure. US negotiators leaving without a peace deal with Iran Deputy ​Minister of Oil Mohammad Sadeq ‌Azimifar ⁠told the Student News Network that repair work had begun ​and ​that ⁠part of the Lavan refinery ​is expected to ​resume ⁠operations within about 10 days, with ⁠other ​units coming ​back online gradually.

Go to News Site