Collector
Samastipur–Darbhanga track doubling nears completion after 11 years | Collector
Samastipur–Darbhanga track doubling nears completion after 11 years
Hindustan Times

Samastipur–Darbhanga track doubling nears completion after 11 years

The 16-km doubled stretch from the Samastipur side — covering Samastipur, Muktapur, Kishanpur and Rambhadrapur stations — had already been commissioned earlier. Similarly, the 10-km section from the Darbhanga side, extending up to Thalwara via Laheriasarai, is already operational.

Go to News Site