BERNAMA
KUALA LUMPUR, April 19 (Bernama) -- The Public Works Department (JKR) has been instructed to carry out a detailed technical investigation to determine the actual cause of the flooding incident that led to the collapse of a retaining wall near Phase 1B at Jalan Abang Haji Openg, Taman Tun Dr Ismail (TTDI), yesterday.
Go to News Site