Collector
Chandigarh: ₹16-cr Sukhna Choe bridge okayed, to do away with congestion, rain disruptions | Collector
Chandigarh:  ₹16-cr Sukhna Choe bridge okayed, to do away with congestion, rain disruptions
Hindustan Times

Chandigarh: ₹16-cr Sukhna Choe bridge okayed, to do away with congestion, rain disruptions

Work on 500-metre long and 26.6-metre wide bridge to begin by July after 3 months of tendering process; project to connect Manimajra’s Shastri Nagar with Sector 26

Go to News Site