Metro TV Ghana
The Ministry of Energy and Green Transition has announced the successful restoration of two critical generation units at GRIDCO’s Akosombo Substation, following a devastating fire that disrupted power supply across the country. The fire, which broke out recently, caused severe damage to the substation’s control room, disrupting the evacuation and transmission of electricity. In an […] The post GRIDCO Fire Update: Two Generation Units Restored, Repairs Continue – Energy Minister appeared first on Metro TV Online .
Go to News Site