Collector
Gov’t moves to upgrade power system after Akosombo switchyard fire | Collector
Gov’t moves to upgrade power system after Akosombo switchyard fire
Joy 99.7 FM

Gov’t moves to upgrade power system after Akosombo switchyard fire

Government has announced plans to construct an ultra-modern, state-of-the-art power control centre following a fire incident that damaged critical control units at the switchyard of the Akosombo Dam, triggering power supply challenges across parts of the country.

Go to News Site