Collector
MCG ramps up anti-waterlogging works ahead of monsoon in Gurugram | Collector
MCG ramps up anti-waterlogging works ahead of monsoon in Gurugram
Hindustan Times

MCG ramps up anti-waterlogging works ahead of monsoon in Gurugram

28 ponds to be revived and linked to drains; 206 modular RWH systems under construction, while 41 of 49 micro STPs are already operational

Go to News Site