Collector
Plan to resurface damaged highway stretches faces pushback | Collector
Plan to resurface damaged highway stretches faces pushback
Hindustan Times

Plan to resurface damaged highway stretches faces pushback

The work, which would cost ₹121.62 crore, would be completed within six months, including the monsoon period. However, corporators across parties questioned whether it was at all necessary

Go to News Site