Plan to resurface damaged highway stretches faces pushback | Collector
Hindustan Times
Plan to resurface damaged highway stretches faces pushback
The work, which would cost ₹121.62 crore, would be completed within six months, including the monsoon period. However, corporators across parties questioned whether it was at all necessary