Increase pace of works at Zaheerabad NIMZ: Sangareddy Collector | Collector
The Hindu
Increase pace of works at Zaheerabad NIMZ: Sangareddy Collector
The NIMZ is proposed to be spread around 12,300 acres, of which around 7,000 acres were acquired. It is being established for heavy industries to set up large scale units