Collector
EPA decides dredging 800,000 cubic metres of seabed does not require formal environmental assessment | Collector
EPA decides dredging 800,000 cubic metres of seabed does not require formal environmental assessment
The West Australian

EPA decides dredging 800,000 cubic metres of seabed does not require formal environmental assessment

A proposed bypass shipping channel at Port Hedland has moved a step closer to development after the Environmental Protection Authority ruled the project does not require a formal environmental assessment.

Go to News Site