Hindustan Times
The committee unanimously rejected the contractor M/s Star Electric, which the BMC administration had recommended, because its bid was 22.5% lower than the civic body’s estimate of ₹7.51 crore. Of the five bids received by the BMC, four were lower than this estimated cost.
Go to News Site