Collector
Pune Metro phase 2 proposes 22 km of integrated double-decker flyovers across city | Collector
Pune Metro phase 2 proposes 22 km of integrated double-decker flyovers across city
Hindustan Times

Pune Metro phase 2 proposes 22 km of integrated double-decker flyovers across city

The proposed corridors will feature six-lane and eight-lane elevated roads integrated with the metro infrastructure at multiple locations, aimed at easing traffic congestion while expanding the city’s mass transit network.

Go to News Site