Collector
Cost of 238 AC locals goes up by ₹4,500 crore even before bids are finalised | Collector
Cost of 238 AC locals goes up by  ₹4,500 crore even before bids are finalised
Hindustan Times

Cost of 238 AC locals goes up by ₹4,500 crore even before bids are finalised

Mumbai’s local train upgrade faces delays and cost hikes, with project costs rising from ₹21,646 crore to ₹26,175 crore, now expected by 2033-34.

Go to News Site